HOME
Feature
Construction Cost Reduction
  • Existing Cast-in-place Concrete Sump
  • Barona Smart Steel Sump
Smart Sump Structure and Principle
  • ·The mat foundation bears the moment and shear loads acting on the foundation.
  • ·Rebar opening reinforcement is placed around the sump.
  • ·The lower sump plate withstands bearing capacity and water pressure, while the mat foundation supports the lower sump plate.
Installation process
  • 1. Factory Fabrication
  • 2. Transportation and Unloading
  • 3. Fixing the Lower Rebar
  • 4. Fixing the Upper Rebar
  • 5. Completion of Foundation Pouring
  • 6. Pump Installation
Project
Constructor Project
Seohae General Construction New Construction of Uijeongbu Office Building
Hanwon Construction Group New Construction of Ulsan Office Building
Daewoong General Technology New Construction of Jayang-dong Office Building
S-Space Construction New Construction of Gwangmyeong Haneulbit Methodist Church
Overseas Business Team
Tel : +82-2-413-6503
  • Director Joseph Lee (Ext.55)
  • Assistant Manager/Engineer Russell Kim (Ext.19)
-