Abstract
3D Rebar detail
  • Structural Quantity Take-Off(QTO) for execution stage
    3D model-based QTO achieves higher accuracy than conventional methods
  • Review design errors and constructability
    3D modeling enables detailed structural stability and constructability reviews along with accurate rebar clash detection
  • Rapid Response
    Enables an average 20% reduction in rework time due to design changes and site condition changes
  • Prefabrication
    Identical elements in the model can be identified and prefabricated prior to site delivery Prefabrication reduces construction time and required manpower while achieving precise construction
Work Process
Pre-Construction Structural Quantity Take-Off (QTO)
Pre-construction structural Quantity Take-Off(QTO)
3D modeling enables design error detection and accurate structural QTO
3D Rebar BIM
Rebar detail drawing using 3D BIM
Rebar 3D modeling enables pre-construction clash detection, minimized rebar quantity loss, and structural QTO verification
Work Collaboration
Collaborative workflow using Trimble Connect
Trimble Connect enables cloud-based collaboration and data sharing among practitioners through integrated architectural, structural and MEP data
Performance Record / Track Record
Constructor Project Application Year
Overseas Business Team
Tel : +82-2-413-6503
  • Director Joseph Lee (Ext.55)
  • Assistant Manager/Engineer Russell Kim (Ext.19)
-