Early pre-construction steel modeling system for the initial estimation of steel material order quantities based on length specifications. / DBS: Maximizing construction efficiency through simultaneous execution of specialized top-down steel and rebar detailing work.
Baro Construction Key-technology’s steel MODELING and EDITING
  • Integrated Design
    We carry out 3D modeling using the TEKLA Structures program and share the models with the construction site through the Web Viewer to improve work efficiency.
  • Improved Accuracy
    We predict real-world construction outcomes by directly applying even the rebar details not visible in the drawings. Through simulation, we can ensure accuracy while minimizing unnecessary material quantities.
  • Collaboration with Structural Experts
    Structural experts at Baro Construction Key-technology contribute to improving on-site efficiency and resolving construction issues, thereby enhancing structural reliability.
  • Production
    Factory production based on accurate 3D modeling and drawings helps reduce manufacturing errors while improving cost efficiency and overall quality.
Work process
MODELING
Steel MODELING Work
Using the Tekla Structures program, we carry out modeling based on architectural and structural drawings, while identifying connection errors or non-constructible members in advance for review and clarification.
EDITING
Steel Frame EDITING Work
After the modeling process is completed, steel frame drawings for factory fabrication and installation are prepared. Once the drawings are finalized, they are reviewed by the Steel Detailing Team and the Structural Team to identify and correct drafting errors.
B.O.M
Bill of Material (B.O.M) Calculation
We prepare the Bill of Materials (B.O.M) to efficiently manage the quantities of steel frames and sub-components supplied to construction sites.
Performance
  • Neuti Village Complex 4 Remodeling
    Neuti Village Complex 4 Remodeling
    • · Scale : B3F~1F
    • · Client : POSCO E&C
  • Yeongcheon Area Residential Redevelopment Improvement Project
    Yeongcheon Area Residential Redevelopment Improvement Project
    • · Scale : B4F~1F
    • · Client : Bando Engineering & Construction Co., Ltd
  • Combined Development Project of the Former UN Command Site in Itaewon
    Combined Development Project of the Former UN Command Site in Itaewon
    • · Scale : B6F~5F
    • · Client : Hyundai Engineering & Construction Co., Ltd.
  • Dunchon Hyundai 1st Apartment Remodeling project
    Dunchon Hyundai 1st Apartment Remodeling project
    • · Scale : B1F~1F
    • · Client : POSCO E&C
  • Construction of Mixed-use Residential-commercial Complex in Daemyeong-dong, Daegu
    Construction of Mixed-use Residential-commercial Complex in Daemyeong-dong, Daegu
    • · Scale : B4F~1F
    • · Client : Bokwang Construction Co. Ltd.
  • Mixed-use Residential-commercial Complex in Ochang-eup, Cheongju
    Mixed-use Residential-commercial Complex in Ochang-eup, Cheongju
    • · Scale : B5F~1F
    • · Client : POSCO E&C
  • Construction of Happy Housing near Seocho-dong Station Area
    Construction of Happy Housing near Seocho-dong Station Area
    • · Scale : B4F~2F
    • · Client : Lotte Engineering & Construction Co., Ltd
  • Parking Facility Building in Jungbang-dong, Gyeongsan-si
    Parking Facility Building in Jungbang-dong, Gyeongsan-si
    • · Scale : B4F~5F
    • · Client : DongYang Constructions
Other projects
Construction company Project Year
Hyundai Engineering & Construction Co., Ltd. Construction of Mixed-use Residential-commercial Complex for the Busan Beomcheon 1-1 District Urban Environment Redevelopment Project 2026
GS Engineering & Construction Corp. Remodeling Housing Project for Cheongdam Geonyeong Apartment 2026
Doosan Engineering & Construction Co., Ltd. New Apartment Construction Project for the Gupo District 7 Regional Housing Association 2026
Songsan Construction Customer Parking Facility Renovation Project for Seoul National University Hospital 2025
Jungang Construction Mixed-Use Facility Construction Project on the Former Cheongnyangni Hospital Site 2025
Yojin Construction & Engineering Co.,Ltd. New Construction Project at 368 Cheongnyang-ri, Dongdaemun-gu 2025
Hyundai Engineering & Construction Co., Ltd. New Headquarters Building Construction Project for Seongwon Adpia in Hanam 2025
ChinHung International, Inc. Construction of Mixed-use Residential-commercial Complex in Gyeongjang-dong, Gunsan 2024
BOMI Engineering & Construction Construction of Mixed-Use Facility in Itaewon 2024
POSCO Eco & Challenge Neuti Village Complex 4 Remodelin 2024
HS HWASUNG CO., LTD New Office Building Construction Project for Hanwha Life in Daegu 2024
Baro Construction Key-technology (Co., Ltd.) Gukhoe-daero Underground Roadway 2023
Baro Construction Key-technology (Co., Ltd.) Factory Expansion Project in Gyerim-ri, Daesin-myeon, Yeoju 2023
BOMI Engineering & Construction Dangsan Rental Housing Development Project 2023
Hyundai Steel Company New Construction Project for Hillstate Dowon Central 2023
KyeRyong Construction Industrial Co., Ltd. Mia-dong Station Area Sites A and B 2023
Daesungmoon Co., Ltd. Mixed-Use Facility Project in Yangjeong-dong, Busan 2023
Maru Design Construction KID Research Institute 2022
Daesungmoon Co., Ltd. Mixed-use Residential-commercial Complex at 828-9 Beomil-dong 2022
Ian Construction New Construction Project at 142 Samcheong-dong and 1 Additional Area 2022
Overseas Business Team
Tel : +82-2-413-6503
  • Director Joseph Lee (Ext.55)
  • Assistant Manager/Engineer Russell Kim (Ext.19)
-